Once the Master Plan was complete, design and construction documents were prepared for the 6,700 SF Fire Station component. The design made provisions for an addition to include additional apparatus bays for future construction.
Once the Master Plan was complete, design and construction documents were prepared for the 6,700 SF Fire Station component. The design made provisions for an addition to include additional apparatus bays for future construction.